Easy To Download SAP C-TS422-2020 Exam Dumps Updated 82 Questions
New Updated C-TS422-2020 Exam Questions 2021
SAP S/4HANA Production Planning and Manufacturing Certification Exam Details:
| Number of Questions | 80 |
| Sample Questions | SAP S/4HANA Production Planning and Manufacturing Certification Sample Questions |
| Exam Code | C_TS422_2020 |
| Exam Name | SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing |
| Duration | 180 mins |
| Level | Associate |
| Exam Price | $550 (USD) |
| Reference Books | TS421, TS422 (SAP S/4HANA 2020) TS421 (SAP S/4HANA 1909), TS422 (SAP S/4HANA 1909) |
| Schedule Exam | SAP Training |
| Passing Score | C_TS422_2020 - 56% C_TS422_1909 - 55% |
NEW QUESTION 13
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Make-to-order production (20)
- B. Make-to-stock production (10)
- C. Planning with final assembly (40)
- D. Planning without final assembly (50)
Answer: C
NEW QUESTION 14
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. In Customizing you can decide by material type whether to use the long material number.
- B. The display template for material numbers applies to all clients.
- C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: B,C
NEW QUESTION 15
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Past procurement quantities
- C. One-off events
- D. Past sales order quantities
- E. Market intelligence
Answer: C,D,E
NEW QUESTION 16
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.
- A. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
- B. Add the agreement to the quota arrangement and mark it for MRP relevance.
- C. Add the agreement to the source list and mark itfor MRP relevance.
- D. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Answer: A,C
NEW QUESTION 17
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific stock is created
- C. Sales order-specific planning run is required.
- D. Storage location MRP areas are required.
- E. Net requirements calculation is sales order-specific.
Answer: A,B,E
NEW QUESTION 18
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the production order type
- B. In the production version
- C. In the MRP controller
- D. In the bill of materials (BOM)
- E. In the routing
Answer: A,C,E
NEW QUESTION 19
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Validity period or sales order
- B. Planned order or materialnumber
- C. Alphanumeric or quota arrangement
- D. Lot size or material cost
Answer: C
NEW QUESTION 20
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Replenishment strategy
- B. Control cycle
- C. Production supply area
- D. Rate routing
Answer: B
NEW QUESTION 21
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a reservation.
- B. It is converted into a schedule line.
- C. It is converted into a planned order.
- D. It is converted into a production order.
Answer: A
NEW QUESTION 22
What data can you maintain in the sub items of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Scrap percentage
- B. Installation point
- C. Item type
- D. Quantity
Answer: B,D
NEW QUESTION 23
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Kanban
- B. Picking list
- C. Transfer Order
- D. Backflushing
Answer: B
NEW QUESTION 24
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of material masters
- C. To increase the number of planning levels
- D. To reduce the number of changes required in bills of material
- E. Tosimplify the structure of bills of material
Answer: A,D,E
NEW QUESTION 25
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planned order generates capacity requirements.
- B. The planned order is converted to a production order.
- C. The planned order's components are copied from the picking list.
- D. The planned order's component availability is checked
Answer: A
NEW QUESTION 26
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run MRP with quotaarrangement.
- B. Assign planned orders manual lying the planning table.
- C. Run MRP with automatic selection of production version.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: A,D
NEW QUESTION 27
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements only if the work center has sufficient capacity.
- B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- C. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
- D. MRP creates capacity requirements without checking the capacity of a work center.
Answer: D
NEW QUESTION 28
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Functional Location BOM
- B. Work Center BOM
- C. Sales Order BOM
- D. Class BOM
Answer: A,C
NEW QUESTION 29
......