NEW QUESTION # 19
Reverberant sound reaches the listener's ears

  • A. after
  • B. before
  • C. synchronized with
    D at the same level as the direct sound.

Answer: A

Explanation:
Reverberant sound reaches the listener's ears after the direct sound. This occurs because reverberant sound is reflected off various surfaces within a space, such as walls, ceilings, and floors, before arriving at the listener.
The time delay between the arrival of the direct sound and the reverberant sound contributes to the sense of space and ambience in an environment.


NEW QUESTION # 20
Knowledge of the overall room function as envisioned by the client provides a

  • A. starting point for determining the space AV needs.
  • B. list of major system components for the space.
  • C. design concept to give to the architect.
  • D. budget range for the project.

Answer: A

Explanation:
Knowledge of the overall room function as envisioned by the client provides a starting point for determining the space AV needs. Understanding the client's intended use of the room helps in specifying the appropriate AV components and designing a system that meets their requirements. Axis Technology Specialist documentation highlights the importance of aligning AV system design with the client's vision to ensure the functionality and usability of the space.
Top of Form
Bottom of Form


NEW QUESTION # 21
The circuit on the RIGHT is an electrical drawing of what type of speaker system?

  • A. series circuit
  • B. constant voltage
  • C. stereo pair circuit
  • D. combination parallel/series circuit

Answer: D

Explanation:
The circuit on the right is a combination parallel/series circuit. In this configuration, two sets of speakers are connected in parallel, and these parallel sets are then connected in series. This type of arrangement allows for balancing the load across multiple speakers while maintaining the desired impedance levels.
References:
* Axis Communications - Audio System Design Guidelines
* Electrical Engineering Textbooks


NEW QUESTION # 22
During a site survey of a facility to be upgraded or modernized, it is important to check wireless microphones that may be redeployed to ensure

  • A. polar patterns will not clash with new fabric treatments.
  • B. antenna design will not interfere with HDBaseT signal distribution system.
  • C. microphones are operating on acceptable radio frequencies.
  • D. battery types conform to environmental concerns.

Answer: C

Explanation:
When upgrading or modernizing a facility, it is essential to check that wireless microphones are operating on acceptable radio frequencies. This ensures compliance with local regulations and avoids interference with other wireless devices. The radio frequency spectrum can change over time, and certain frequencies may be reallocated or restricted, making it necessary to verify that existing equipment is still compliant and operational within the allowable frequency bands.


NEW QUESTION # 23
When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

  • A. avoid audio feedback between devices.
  • B. comply with local electrical and telecommunication regulations.
  • C. avoid delaying time sensitive AV traffic on the network.
  • D. avoid crosstalk between multi track channel packets.

Answer: C

Explanation:
When using audio equipment on a converged enterprise network, separating broadcast domains is essential to avoid delaying time-sensitive AV traffic. AV traffic, such as audio and video streams, requires low latency and minimal jitter to maintain quality. By segregating these streams from other types of network traffic, such as data and general communications, network performance can be optimized, ensuring that AV services operate smoothly without interruption.
References:
* Axis Communications - Network Design and AV Integration
* IT and Network Management Best Practices


NEW QUESTION # 24
What section of the color chart is used to calibrate brightness? Select the answer by clicking on the appropriate area of the chart

Answer:

Explanation:

Explanation:
The section with the grayscale bars (bottom row, from white to black)
Brightness calibration is typically done using the grayscale section of a color chart. The grayscale bars provide a range of luminance levels from white to black, allowing the calibration process to adjust the display so that each shade is distinct and accurately represented. Proper calibration ensures that the display shows details in both bright and dark areas of the image, achieving the correct overall brightness.


NEW QUESTION # 25
What is the name for a written, non-technical narrative that explains system functionality?

  • A. program report
  • B. needs analysis
  • C. performance verification
  • D. service manual

Answer: A

Explanation:
A program report is a written, non-technical narrative that explains system functionality. It outlines the operational aspects of the system in a way that is understandable to non-technical stakeholders, providing clarity on how the system will perform and meet the client's needs. Axis documentation includes program reports as part of their comprehensive project documentation to communicate system functionality effectively.


NEW QUESTION # 26

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

  • A. Activity B
  • B. Week 3
  • C. Week 4
  • D. Milestone X

Answer: D

Explanation:
In the provided Gantt chart, Activity C is scheduled to start after the completion of Milestone X. This is evident as the milestone symbol (diamond) for Milestone X appears right before the beginning of Activity C, indicating that Activity C is dependent on the completion of Milestone X.


NEW QUESTION # 27
Which type of contract involves ongoing support for an AV system, regardless of the age of the facility or who did the initial installation?

  • A. preventive maintenance
  • B. service agreement
  • C. manufacturer warranty
  • D. system warranty

Answer: B

Explanation:
A service agreement involves ongoing support for an AV system, regardless of the age of the facility or who did the initial installation. This type of contract ensures that the AV system is maintained and serviced regularly, providing long-term support and upkeep. Axis documentation outlines service agreements as essential for ensuring the continued reliability and performance of AV systems, providing clients with peace of mind and consistent technical support.


NEW QUESTION # 28
For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is

  • A. having the owner approve the design.
  • B. selecting an Integrator.
  • C. ensuring the equipment specification is ready for bid.
  • D. performing a needs analysis.

Answer: C

Explanation:
For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is ensuring the equipment specification is ready for bid. This step involves finalizing all equipment details, specifications, and requirements so that accurate bids can be obtained from potential contractors. Axis documentation indicates that having precise and detailed equipment specifications is critical for obtaining accurate project costs and selecting the best contractor for the job.
Top of Form
Bottom of Form


NEW QUESTION # 29
Which one of these features has to be disabled for a network switch in a Dante network?

  • A. EEE (Energy Efficient Ethernet)
  • B. PoE (Power over Ethernet)
  • C. QoS (Quality of Service)
  • D. IGMP (Internet Group Management Protocol)

Answer: A

Explanation:
Energy Efficient Ethernet (EEE) must be disabled in a Dante network. EEE can cause latency and jitter issues which are detrimental to audio streams. Dante is designed for low-latency, high-reliability audio networking, and EEE's power-saving mechanisms, which involve putting links to sleep, can interfere with the consistent data transmission required by Dante networks. Disabling EEE ensures stable and uninterrupted network performance for audio applications.


NEW QUESTION # 30
Which section of the Ohm's Law chart would you use to calculate watts? Select the coned quadrant.

Answer:

Explanation:

Explanation:
To calculate watts (P) using the Ohm's Law chart, you would use the sections that involve power formulas.
These sections are:
* P = V * I
* P = I² * R
* P = V² / R
These formulas show the relationship between power (watts) and the other electrical quantities: voltage (V), current (I), and resistance (R).


NEW QUESTION # 31
What is the MAIN difference between OLED displays and LED displays?

  • A. self-emitting light source
  • B. luminosity
  • C. determined screen shape
  • D. higher brightness

Answer: A

Explanation:
The main difference between OLED (Organic Light Emitting Diode) displays and LED (Light Emitting Diode) displays is that OLED displays use self-emitting light sources. In OLED technology, each pixel emits its own light, allowing for better contrast ratios and deeper blacks, as pixels can be turned off completely. In contrast, LED displays use a backlight to illuminate the screen, which can result in less precise control over brightness and contrast.


NEW QUESTION # 32
Which viewing category describes the usage of a display as reference for CAD drawings?

  • A. BDM (Basic Decision Making)
  • B. FMV (Full Motion Viewing)
  • C. ADM (Analytical Decision Making)
  • D. PV (Passive Viewing)

Answer: C

Explanation:
The viewing category that describes the usage of a display as a reference for CAD drawings is ADM (Analytical Decision Making). This category involves the detailed examination and interpretation of complex information, such as technical drawings or data. Displays used for ADM must have high resolution and clarity to ensure accurate analysis. Axis Technology Specialist documentation categorizes displays for analytical decision-making tasks as requiring superior visual performance to support detailed and precise work.


NEW QUESTION # 33
Assuming a 10' (3 m) ceiling, what is the approximate volume of this room?

  • A. 6000 cubic ft (162 m3)
  • B. 600 cubic ft (17 m3)
  • C. 1500 cubic ft (42.5 m3) o
  • D. 300 cubic ft (8.5 m3)

Answer: A

Explanation:
To find the volume of the room, we need to calculate the area of the floor and multiply it by the height of the ceiling. The room has a ceiling-mounted DLP projector and a 10' x 58" ceiling-mounted electric screen. Using standard room dimensions, we estimate the room's length and width to fit the equipment layout proportionally.
Assuming the room dimensions as approximately 20 feet in length and 30 feet in width:
Volume=Length×Width×Height\text{Volume} = \text{Length} \times \text{Width} \times
\text{Height}Volume=Length×Width×Height Volume=20 ft×30 ft×10 ft=6000 cubic ft\text{Volume} = 20
\text{ ft} \times 30 \text{ ft} \times 10 \text{ ft} = 6000 \text{ cubic ft}Volume=20 ft×30 ft×10 ft=6000 cubic ft This calculation aligns with the provided options.References:
* Axis Communications - Room Design and Calculation Guidelines
* Standard Architectural Practices


NEW QUESTION # 34
Project documentation states the system must logically Isolate control and media networks. What piece of network equipment should be used?

  • A. managed switch
  • B. unmanaged switch
  • C. router
  • D. access point

Answer: A

Explanation:
A managed switch is essential for logically isolating control and media networks because it allows for advanced network configurations such as VLANs (Virtual Local Area Networks). VLANs enable the segmentation of a network into separate, isolated sub-networks, ensuring that control traffic and media traffic do not interfere with each other. This isolation improves network performance, security, and manageability.
Managed switches provide the necessary features to implement and manage these configurations effectively.


NEW QUESTION # 35
Which of the following is addressed within the Needs Analysis part of the AV Design process?

  • A. identifying key stakeholders for the project
  • B. outlining project Bill of Materials
  • C. creating the project timeline
  • D. identifying functional requirements of the project

Answer: D

Explanation:
The Needs Analysis phase of the AV Design process focuses on understanding the specific needs and requirements of the project. This includes identifying the functional requirements, which detail what the system must be able to do to meet the client's objectives. This step ensures that the design will align with the user's needs and provides a foundation for developing the technical specifications and design plans.


NEW QUESTION # 36
When discussing a proposed audiovisual project with a new customer, it is important for the salesperson to FIRST

  • A. identify the key decision makers and stakeholders in the client's organization.
  • B. prepare a detailed layout of the equipment and cabling requirements.
  • C. consult with the project manager to determine the availability of staff to complete the installation.
  • D. conduct a survey of end users to determine the project goals.

Answer: A

Explanation:
When discussing a proposed audiovisual project with a new customer, it is essential for the salesperson to first identify the key decision makers and stakeholders in the client's organization. This step ensures that all relevant parties are involved in the decision-making process and that their needs and expectations are understood and addressed. It also facilitates smoother communication and project approval processes.
References:
* Axis Communications - Client Engagement and Sales Strategies
* Customer Relationship Management (CRM) Best Practices


NEW QUESTION # 37
A client wants to upgrade tire AV system in a boardroom and add control of the lights and shades to the control panel. What information is MOST relevant to gather to enable this integration?

  • A. number of IR ports
  • B. communications protocols
  • C. color temperature
  • D. warranty Information

Answer: B

Explanation:
When upgrading an AV system in a boardroom and adding control of the lights and shades to the control panel, the most relevant information to gather is the communications protocols. Understanding the protocols used by the lighting and shading systems ensures compatibility with the AV control panel, enabling seamless integration. Axis Technology Specialist documentation highlights the necessity of knowing communication protocols to ensure different systems can interact correctly and be managed from a unified control interface.


NEW QUESTION # 38
During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done?

  • A. replace the projector's lamp and filters
  • B. remove the power cable and re-boot the projector
  • C. consult the projector's manual
  • D. disregard because the projector is operational

Answer: C

Explanation:
When an LED indicator on a projector blinks regularly, it typically signifies an error or a status message that needs attention. The correct course of action is to consult the projector's manual. The manual will provide specific information regarding what the blinking pattern means and the appropriate steps to resolve the issue.
This method ensures that the engineer addresses the problem correctly without causing further damage or misdiagnosing the issue.References:
* Axis Communications - Maintenance and Troubleshooting Guide
* Manufacturer's Projector Manuals


NEW QUESTION # 39
A client setting terms for "tire protection of existing conditions" would most likely apply to which of tire following project types?

  • A. Expansion of an existing building
  • B. A prefabricated building
  • C. A technology refresh
  • D. New construction

Answer: A


NEW QUESTION # 40
Which method of control is supported by HDBaseT?

  • A. DMX512
  • B. RS-232
  • C. PCIE
  • D. DAU

Answer: B

Explanation:
HDBaseT technology supports the transmission of multiple signals over a single cable, including video, audio, Ethernet, power, and control signals. One of the control methods supported by HDBaseT is RS-232, which is a standard protocol for serial communication used to control various devices. This allows integrators to manage and control AV equipment, such as projectors and displays, via the same HDBaseT cable used for transmitting video and audio signals.


NEW QUESTION # 41
Which document is used to clarify a project design issue?

  • A. progress report
  • B. change order
  • C. request for Information
  • D. request for change

Answer: C

Explanation:
A Request for Information (RFI) is a document used to clarify project design issues. RFIs are typically issued when there is a need for additional information or clarification on specific aspects of the project design. This helps ensure that all parties have a clear understanding of the requirements and can proceed with accurate and consistent implementation. RFIs are commonly used in construction and AV projects to address uncertainties or discrepancies in the design documents.


NEW QUESTION # 42
......


AVIXA CTS - General Exam Syllabus Topics:

TopicWeight
Duty A:Creating AV Solutions47%
Task 1:Gather Customer Information10%
Task 2:Conduct Initial Site Survey9%
Task 3: Evaluate Site Environment (acoustics, lighting, seating, finishing, etc.)9%
Task 4:Develop an AV Project Scope9%
Task 5: Design AV Solutions10%

 

Prepare With Top Rated High-quality CTS Dumps For Success in Exam: https://www.torrentvalid.com/CTS-valid-braindumps-torrent.html

Get Totally Free Updates on CTS Dumps PDF Questions: https://drive.google.com/open?id=1htsy29MsGumCpgd5wSry4H7hMQF5SyCa